Our Equipment
We are able to perform the whole range of services related to the drilling, testing, workover, and completion projects.
WORKOVER AND DRILLING RIGS
|
SPECIFICATIONS |
UM |
RIG |
TYPE |
|
|
|
|
T-50 DH |
P80-DH |
CABOT 900 |
|
Max working hook load |
mt |
50 |
100 |
200 |
|
|
lbs |
110000 |
220500 |
440000 |
|
Recommended drilling depth with 4 ½” drill pipes |
m |
1000 |
2300 |
4000 |
|
|
ft |
3281 |
7550 |
118 |
|
Max. installed power(without engine of pump group) |
HP |
415 |
415 |
950 |
|
Nr. of drawworks speeds |
|
2 + 2Rev |
2+ 2Rev |
6 |
|
Derrick floor height |
mm |
2800 |
3700 |
|
|
|
ft |
9.18 |
12.13 |
118 |
|
Rotary table opening |
in |
17 1/2 |
20.1/2 |
27 1/2 |
|
Nr. of speeds at rotary table |
|
2 + 2Rev |
2+ 2Rev |
6 |
|
Type of mud pump |
|
2 PN 400 |
2PN 700 |
9P100 |
RIGGING
- Martin-Decker weight indicators with 6 pen drilling recorder to record: hook weight, penetration rate, pump strokes, pump pressure, rotary torque and rotary RPM.
- Mud preparing and cleaning systems, composed by:
- Swaco Shale shakers, Swaco mud cleaners (with desilter and desander) and Swaco centrifuges (type 518 and 414);
- Vacuum degassers;
- Mud Pumps, different sizes, triplex or duplex;
- Pipe Spinner and Power Tongs;
- The Diesel Rigs have been equipped with Pramac Generators;
- The drilling string provided by us consists of the whole range and sizes of the drill collars and drill pipes, Premium class;
- The BOP of all range, according to API RP 53;
- Koomey Unit driven both hydraulic and pneumatically;
- Methane gas and H2S sensor;
- Pit level indicator completely automatized ;
- Power swivel;
- Float valve.
We have our own camps, which offer the best conditions for the drilling crew and for the Operators representatives on location and are composed of:
- 2*2 cab with well resting conditions and air conditioning systems;
- kitchens, dinning rooms;
- showers;
- Clubs with TV - sets and video recordings.
WELL MONITORING
Develtor shall provide well monitoring capabilities, which shall include, but not be limited to, the following:
1. Workover and Drilling
Continuous monitoring of the following parameters during the relevant operations:
1.1 Bit depth (metres);
1.2 Tripping depth (metres);
1.3 Rate of penetration (min/meter);
1.4 Tripping speed (metres per minute);
1.5 Rotary speed (revolutions per minute);
1.6 Hookload weight sensor;
1.7 Weight on bit;
1.8 Standpipe pressure (pounds per square inch);
1.9 Independent pump stroke rates for 2 mud pumps;
1.10 Total pump strokes for up to 3 pumps (individual and combined);
1.11 Mud pit volume (barrels) - individual and total volumes for up to 2 pits;
1.12 Mud temperature in (degrees Centigrade and/or Fahrenheit);
1.13 Mud temperature out (degrees Centigrade and/or Fahrenheit);
1.14 Rotary torque (foot pounds).
2. Reports
Daily and interval reports shall include the following:
2.1 Geological summary of formations drilled and hydrocarbon data;
2.2 Summary of interval and bit run ROP\\\'s;
2.3 Bit, pump and hole hydraulics data;
2.4 Drilling parameters;
2.5 Bit run data including cost per foot economics;
2.6 Formation pressure data;
2.7 Recommendations and remarks;
Weekly and final well reports, according to the Company’s requirement, consist of:
· Statistical summary;
· Daily operations summary;
· Time breakdown analysis;
· Bit and core records;
· Pore pressure and fracture gradient discussion;
· Geological summary of the well.







